Search Results: ED*

Showing 1,071 - 1,080 of 1,410 results

Display results per page.
  • Media type icon

    ACC-SVN155E-EN_12032022

    Edge protector 2 Installation and operation manual 1 Rubber grommet 1 Table 2. Factory installed component parts list Qty Description1 Block-off 1 Plastic bag containing screws NOTICECorrosion Damage!Use of non-recommended caulking/sealant could cause corrosion related failures to refrigeration
  • Media type icon

    ACC-SVN157E-EN_12032022

    Document Title:Power Exhaust Kit Foundation™ Packaged Rooftop Units 15 to 25 Tons
    Publication Type:Installation
    Publication Date:2022-12-03
    Important: Use provided wire ties to make sure wires are secured and protected from sharp edges, rotating parts, and hot surfaces. Power WiringOn units with a factory installed variable frequency drive (VFD), route the long, dual, high-voltage wires to the VFTB1 located inside the VFD panel (see Figure 22
  • Media type icon

    RT-SVX057H-EN_08232024

    Document Title:Packaged Rooftop Air Conditioners Foundation™ Cooling Only and Electric Heat 3 to 5 Tons, 60Hz
    Publication Type:Installation Operation and Maintenance
    Publication Date:2024-08-23
    that the installation location of the unit willprovide the required clearance for proper operation. ☐ Assemble and install the roof curb (if applicable). Referto the latest edition of the curb installers guide thatships with each curb kit. ☐ Fabricate and install ductwork; secure ductwork tocurb. ☐
  • Media type icon

    RT-SVX058J-EN_08232024

    clearance for proper operation. ☐ Assemble and install the roof curb (if applicable). Referto the latest edition of the curb installers guide thatships with each curb kit. ☐ Fabricate and install ductwork; secure ductwork tocurb. ☐ Rigging the unit.☐ Set the unit onto the curb; check for levelness.☐
  • Media type icon

    RT-SVX069F-EN_08232024

    and install the roof curb (if applicable). Referto the latest edition of the curb installers guide thatships with each curb kit. 16 RT-SVX069F-EN ☐ Fabricate and install ductwork; secure ductwork tocurb. ☐ Rigging the unit.☐ Set the unit onto the curb; check for levelness.☐ Ensure unit-to-curb seal
  • Media type icon

    RT-SVN037A-EN_05282021

    Document Title:Roof Curb For Medium Foundation Packaged Rooftops 7.5 – 12.5 Tons
    Publication Type:Installation
    Publication Date:2021-05-28
    . IImmppoorrttaanntt:: Duct work must be hung from the curbflanges. It must not be installed over thetop edges of the curb. • When the duct is fabricated it should be largeenough to cover the openings for the return andsupply sides of the unit, but the flanges must benarrow enough to slide down inside the
  • Media type icon

    RLC-PRC020M-EN_06012025

    CONDENSER OIL SUMP Dimensions and Weights RLC-PRC020M-EN 25 Figure 3. CDE, DDE, EDE configurations 73.44 [1865 mm] 6.00 [153 mm] 14.38 [366 mm] 67.88 [1723 mm] 12.49 [317 mm] 14.13 [359 mm] COND EVAP OUT IN IN 25.88 [657 mm] OUT EVAPORATOR IN 9.60 [230 mm] 14.88 [378 mm] 107.63 [2734 mm]Standard 3
  • Media type icon

    TF-SVX006A-EN_06152025

    Document Title:Thermafit™ Modular Air-to-Water Heat Pump - Model AXM
    Publication Type:Installation Operation and Maintenance
    Publication Date:2025-06-15
    bereported to the owner of the equipment, so all parties areadvised.Initial safety checks shall include:• Cabling is not subject to wear, corrosion, excessive pressure, vibration, sharp edges, or any other adverseenvironmental effects. Account for the effects of agingor continual vibration from sources such
  • Media type icon

    CLCH-SVX020A-EN_07132025

    -center spacing. • Install clips at single level ship splits containing fans orcoils at 48 inches maximum on-center spacing. • 3 1/4-inch minimum anchor embedment.• 71/2-inch minimum distance to the nearest edge.• 6-inch minimum concrete slab thickness. Steel Dunnage/Steel Curb:1/2-inch diameter ASTM
  • Media type icon

    DCRB-WPR002B-EN_06192025

    Document Title:What's Driving High-Performance Buildings - 5 ELECTRIFIED HEATING TRENDS
    Publication Type:White Paper
    Publication Date:2025-06-19
    cutting-edge efficient technology to extend the operating range for electrified heating beyond the limits of conventional heat pump systems. See the first-ever Thermal Battery Storage-Source Heat Pump System. ▶ COP of 3 on cold mornings, even when its below 0°F (-18°C) ▶ 3 times higher COP than