Search Results: ED*

Showing 491 - 500 of 1,410 results

Display results per page.
  • Media type icon

    18-CH12D15-1B-EN_03042023

    Document Title:Installers Guide - Unitary Accessories. Downflow Gas-Fired Furnace Subbase. Model BAYBASE205
    Publication Type:Installation
    Publication Date:2023-04-03
    ) up. These will be used to locate and secure the furnace. 9. Set the base on the floor over the opening.10. Secure the base to the edge of the flooring with screws or nails through the four holes provided under the side tabs.11. Position insulaton over the subbase.12. Insert the supply duct
  • Media type icon

    18-CH107D1-1C-EN_05312023

    Document Title:Installer's Guide High Altitude Conversion Kit for L8 Furnaces Kit Models: BAYHALTMOD0008, BAYHALTMOD0009, BAYHALTMOD0010, BAYHALTMOD0011
    Publication Type:Installation
    Publication Date:2023-05-31
    with the reduced firing input rates required for high altitude installations, the induced draft blower has ample capacity to provide sufficient combustion air for proper and safe operation. Refer to the National Fuel Gas Code - latest Edition 11.1.2 - High Altitude and Table E.1.1(d). Installer’s
  • Media type icon

    L8V1-SVX001-1A-EN_05232023

    Document Title:Installation, Operation, and Maintenance - Upflow/Horizontal Left/Right Gas-Fired, Single Stage Induced Draft Furnace with Variable Speed Blower Motor, L8V1
    Publication Type:Installation Operation and Maintenance
    Publication Date:2023-05-31
    13.2 13.7 Max. Overcurrent Protection (Amps) 15 15 15 15 PIPE CONN. SIZE (in.) 1/2 1/2 1/2 1/2(a) Central Furnace heating designs are certified to ANSI Z21.47 — latest edition.(b) For U.S. applications, above input ratings (BTUH) are up to 2,000 feet, derate 4% per 1,000 feet for elevations above 2,000
  • Media type icon

    P0V0-SVX001-1A-EN_05312023

    Document Title:Installation, Operation, and Maintenance - Modular Blowers - No Heat, P0V0 models
    Publication Type:Installation Operation and Maintenance
    Publication Date:2023-05-31
    wiring connections andto determine specific requirements. All field wiring to the modular blower should beinstalled in accordance with the latest edition of theNational Electric Code NFPA No. 70 and any localcodes. Check rating plates on unit for rated volts,minimum circuit ampacity and maximum
  • Media type icon

    88-MACC025-1C-EN_06082023

    installation manual. Observe all safety warnings. During installation or repair, caution is to be observed. It is your responsibility to install the product safely and to educate the customer on its safe use. STEP 1. Unfasten 4 screws to take away the blower access panel of the air handler. 4 STEP 2
  • Media type icon

    18-CH66D1-5B-EN_06122023

    Document Title:Installer's Guide - Installation instructions for KIT16582, KIT16583, KIT16584 and KIT16585
    Publication Type:Installation
    Publication Date:2023-06-12
    PROPERTY DAMAGE, PERSONAL INJURY OR DEATH. CAUTIONSharp Edge Hazard. Be careful of sharp edges on equip-ment or any cuts made on sheet metal while installing or servicing. Personal injury may result. 18-CH66D1-5B-EN CAUTIONThe IFC is polarity sensitive. The hot leg of the 115 VAC power must be
  • Media type icon

    18-GJ85D1-1C-EN_07172023

    as close as possible to the twist out hole edges to ensure an air tight fit with breaker(s). 4. With the breakers and air handler blower door in place, set the seal kit over the breakers to cover the blower door knockout. FIGURE 2 TEMBRKSEALKT25A 4-20kW Heaters 4-20kW Heaters 25kW Heaters (All 3) 15
  • Media type icon

    18-HD99D1-1A-EN_08112023

    Document Title:SC360 System Controller / UX360 Smart Thermostat, Zoning Installation Guide
    Publication Type:Installation
    Publication Date:2023-08-11
    . Brand Modes: Zone Name [Zone 1-6]Zone names are defaulted to Zone 1 to Zone 6. Zone name can be select ed from a list or set to a custom name. Zone Priority Low/(Med]/High Customizable setting to specify each zone’s relative priority within the calculations for control of thezones’ capacity and
  • Media type icon

    18-HE72D1-3B-EN_07062023

    Document Title:Installers guide - Duct Shroud Cover Kit (for Horizontal Ducts) BAYCOVR112 for *TC/WC/YC/DC* *018-60A, BAYCOVR118A for *TC/WC/YC/DC* *018-60A
    Publication Type:Installation
    Publication Date:2023-07-14
    top using the #10 x 3/4” screws provided. See Figure 1.2. Dig two trenches between the unit and the building large enough to insert the bottom edge of each side of the cover.3. Loosen up the screws above the horizontal openings on the unit cabinet base. Slide the top of the duct shroud with the “U
  • Media type icon

    18-HE79D1-1E-EN_07062023

    Document Title:Installers Guide - Square to Round Adaptor Kit, Models: BAYSQRD001 and BAYSQRD002
    Publication Type:Installation
    Publication Date:2023-07-14
    adaptors over the supply opening. Align the adaptor so that the left side edge of the adaptor flange is flush to the side of the mitred corner post on the cabinet, and the bottom flange of the adaptor is flush with the bottom of the cabinet. Secure with sheet metal screws. See Figure 1. Figure 1