Search Results: ED*

Showing 871 - 880 of 1,478 results

Display results per page.
  • Media type icon

    BAS-PRD041D-EN_06302024

    Document Title:Symbio™ 800 Controller Data Sheet
    Publication Type:Product Data
    Publication Date:2024-06-30
    terminations. See the Symbio™ 800 Controller Installation, Operation, and Maintenance (BAS-SVX080*-EN) for more information. User security with audit trail supportFlexible and secure access for multiple users allows monitoring, overriding/releasing points, custom report editing, and tracking changes by
  • Media type icon

    AC-SLB006-EN_06272024

    Document Title:CompleteCoat™ Corrosion Protection
    Publication Type:Sales Brochure
    Publication Date:2024-06-27
    coil surfaces, including the edges of the fins, coils, heads, and frame. This advanced material is flexible, avoiding the thermal cracking problems of phenolics, and avoids bridging problems encountered with application of earlier, more viscous coatings. Now you can consider the Trane air-cooled
  • Media type icon

    SO-SVN027C-EN_07142024

    Mechanical Removal of the Existing Unit-Mount-ed LiquiFlo 1.0/1.5 Adaptive Frequency Drive 35 Mechanical Installation of a Unit Mounted D-Frame AFDH (For LiquiFlo Drive Replacement) . . . . . . . . . . . . . . . . . . . . . . . . . .37 Mechanical Installation of a Transition-Mounted D-Frame AFDH
  • Media type icon

    BAS-SVX094A-EN_07142024

    Document Title:Symbio™ Communication Module (CM2)
    Publication Type:Installation Operation and Maintenance
    Publication Date:2024-07-14
    compatible with this module.4. Select Actions > Configure Settings to view/edit the Modbus communication settings of the CM2 module.Note: Confirm the settings prior to defining the first Modbus server, as the definition process is streamlined when the device is connected and communicating. Figure 10
  • Media type icon

    SS-PRC049A-EN_08112024

    available in a variety of voltages and capacities.Foil Faced Insulation—All internal air handler surfaces have cleanable foil-faced insulation. All edgesare either captured or sealed to ensure insulation fibers do not get into the airstream.High Static Motor—Available on many models, this high
  • Media type icon

    PART-SVN266A-EN_09152024

    controller.5. Navigate to Installation > Identification and Communication > Protocol Configuration > Edit.6. Set the rotary dial setting (address) by clicking the line and typing in the new address.7. If the Device ID needs to be changed, check the box next to Use software device ID and enter the
  • Media type icon

    CLCH-SVX010E-EN_08152024

    for Large Unit with Shipping Splits 16 Joining Sections Edge-to-Edge . . . . . . . . . 16 Base with Flat Floor . . . . . . . . . . . . . . . . . . 17 Base with Turned-Up Floor . . . . . . . . . . . . 18 Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Outdoor Roof - Single Span
  • Media type icon

    ACC-SVN187D-EN_08232024

    Document Title:Oversized Motor Kit - Foundation™ Packaged Rooftop Units
    Publication Type:Installation
    Publication Date:2024-08-23
    alignment of blower sheave and motor sheave using a straight edge, and adjust if necessary. Torque the motor sheave set screw and the fan sheave set screw to 126 to 165 inch-pounds (14.2 to 18.6 N-m). 14.Install the belt. 15.Adjust the tension of the fan belt. The correct operating tension for a V-belt
  • Media type icon

    ACC-SVN189D-EN_08232024

    Document Title:Through-the-Base Gas and Electric Connections - Foundation™ Packaged Rooftop Units
    Publication Type:Installation
    Publication Date:2024-08-23
    to 5 Tons Model Number: Used With:Through-the-Base Electric BAYTBUE320* G/EB*036-060 G/ED*036-060 Through-the-Base Gas BAYTBGF320* GB*036-060 GD*036-060 August 2024 ACC-SVN189D-EN ©2024 Trane and American Standard have a policy of continuous product and product data improvement and reserve the
  • Media type icon

    ACC-SVN192D-EN_08232024

    Document Title:Roof Curb - Foundation™ Packaged Rooftop Units
    Publication Type:Installation
    Publication Date:2024-08-23
    be installed.• The metal of fiberboard duct must conform to all local building codes.• The duct must be hung from the curb flanges inside the curb walls. Important: Duct work must be hung from the curb flanges. Do not install over the top edges of the curb. • When the duct is fabricated, it should