Search Results: ED*

Showing 61 - 70 of 1,406 results

Display results per page.
  • Media type icon

    18-AC53D1-8_02012009

    Document Title:Installer's Guide Condensing Units 2TTZ9C with ComfortLink II and Charge Assist
    Publication Type:Installation
    Publication Date:2009-02-01
    should be exercised when opening theLiquid Line Service Valve. Turn valve stem counterclockwiseonly until the stem contacts the rolled edge. (See Figures 3and 5) No torque is required. Failure to follow this warning willresult in abrupt release of system charge and may result inpersonal injury and
  • Media type icon

    18-AC54D1-4_02012009

    Document Title:Installer’s Guide Condensing Units. 2TTX4018-060, 2TTX5024-048
    Publication Type:Installation
    Publication Date:2009-02-01
    exercised when opening theLiquid Line Service Valve. Turn valve stem counterclock-wise only until the stem contacts the rolled edge. (SeeFigure 4) No torque is required. BRASS GAS LINE BALL SERVICE VALVEThe Brass Gas Line Ball Service Valve is shipped in theclosed position to hold the factory
  • Media type icon

    18-BC51D4-1_12012002

    Document Title:Installer's Guide. Heat Pumps Models- 2TWR Canadian Use ONLY.
    Publication Type:Installation
    Publication Date:2002-12-01
    the valve stem cap. 9. The liquid line shut-off valve can now be opened. Removeshut-off valve cap. Fully insert hex wrench into the stemand backout counterclockwise until valve stem justtouches rolled edge (approximately five [5] turns)observing WARNING statement on page 3. See Figure 4. 10
  • Media type icon

    18-BC52D5-5_01012010

    Document Title:Trane Installer's Guide Heat Pumps 2TWB0012-036AA
    Publication Type:Installation
    Publication Date:2010-01-01
    required totake off the valve stem cap. GAS LINE SERVICE VALVE5 4 18-BC52D5-5 Installer’s Guide9. The liquid line shut-off valve can now be opened. Remove shut-off valve cap. Fully insert hex wrench into the stemand backout counterclockwise until valve stem justtouches rolled edge (approximately five [5
  • Media type icon

    18-BC53D1-7_02012009

    Document Title:Installer's Guide. Heat Pumps 2TWZ9C with ComfortLink II and Charge Assist
    Publication Type:Installation
    Publication Date:2009-02-01
    position. The liquid line valve is not a backseating valve (see WARNING below). WARNING!Extreme caution should be exercised when opening the Liquid LineService Valve. Turn valve stem counterclockwise only until thestem contacts the rolled edge. (See Figures 3 and 5). No torque isrequired. Failure to
  • Media type icon

    18-CG01D1-5_09012008

    Document Title:Installation Guide Natural Draft, Gas Fired Water Boiler with Electronic Ignition and Cast Iron Heat Exchanger
    Publication Type:Installation
    Publication Date:2008-09-01
    (most recent edition) - Natural Gas and Propane Installation Code (Canada)2) NFPA 54 (most recent edition) - National Fuel Gas Code (US)3) NFPA 58 (most recent edition) - Liquefi ed Petro-leum Gas Code (US) Adequate fl ow of combustion and ventilating air must not be obstructed from reaching the
  • Media type icon

    18-CG02D1-4_05012007

    Document Title:Installation Guide Direct Vent Gas Fired Water Boiler with Cast Iron Heat Exchanger
    Publication Type:Installation
    Publication Date:2007-05-01
    Code (Canada)2) NFPA 54 (most recent edition) - National Fuel Gas Code (US)3) NFPA 58 (most recent edition) - Liquefi ed Petroleum Gas Code (US) Adequate fl ow of combustion and ventilating air must not be obstructed from reaching the boiler. Air openings pro-vided in the boiler casing must be kept
  • Media type icon

    18-CG03D1-4_05012007

    Document Title:Installation Guide Oil Fired Water Boiler with Three Pass Cast Iron Heat Exchanger
    Publication Type:Installation
    Publication Date:2007-05-01
    boiler to an approved vent system only, as specifi ed in Standard for the Installation of Oil-Burning Equipment, NFPA 31 – (most recent edition). 8. Always install the boiler to operate within the boiler’s temperature operating range and install the specifi ed ASME approved pressure relief valve for
  • Media type icon

    18-GE15D1-2_10012008

    Document Title:Installer's Guide Variable Speed - Communicating Air Handlers with Integrated Whole House Air Cleaner 4TEE3D01B through 4TEE3D10B
    Publication Type:Installation
    Publication Date:2008-10-01
    . UPFLOW1. Before installing unit, remove thumbscrews to the filter panel. Carefully remove the COLLECTIONCELL by grasping the leading edge of the frame.See Figure 5. Set aside in a safe place until theunit is set in place and ready to start up. 2. Use a 5/16" nut driver to remove the screw holdingthe FIELD
  • Media type icon

    18-GJ23D1-1_06012010

    Document Title:Conversion Kit Guide - Conversion to Downflow or Horizontal Left Instructions 4TEE3F (excludes 4TEE3F62)
    Publication Type:Installation
    Publication Date:2010-06-01
    Figure 6. Clean drain pan if necessary and cut gasket to fit as needed. 8. The 64, 65 & 66 models require 2 inner water di-verter baffles to be placed underneath the coil on the inside edge of the drain pan. See Figure 9. Fill the bend in the baffle which fits the inner edge of the drain pan with non