Search Results: 18-CH94D1-1C-EN

Showing 2,981 - 2,990 of 7,190 results

Display results per page.
  • Media type icon

    REFR-SLB016-EN_03272025

    Document Title:Refrigerant Transition Overview - New York (as of February 2025) - Buildings need to do better for the planet. And they will.
    Publication Type:Sales Brochure
    Publication Date:2025-03-27
    continue to be used. Only replacements and new installations must follow the new HFC regulation limits by the date specified. REFR-SLB016-EN 03/27/2025 Trane – by Trane Technologies (NYSE: TT), a global climate innovator – creates comfortable, energy efficient indoor environments through a broad
  • Media type icon

    2309-7555F_02232021

    Document Title:RTHD Schematic, Wye-Delta Starter, Page 4
    Publication Type:Wiring Diagram or Manual
    Publication Date:2021-02-23
  • Media type icon

    ENGY-PRB002A-EN_05132024

    Document Title:Beyond Altruism - How Sustainability Efforts Can Drive Organizational Value
    Publication Type:Sales Brochure
    Publication Date:2024-05-13
    zero commitments in 2023 yet only 18% of them are on track to achieve net zero by 20501 Commercial buildings could save up to 35% in HVAC and lighting energy costs when paired with occupancy monitoring technologies3 Beyond decreased energy use, equipment upgrades will also improve operational and
  • Media type icon

    SRV-SLB008-EN_08022024

  • Media type icon

    2313-0616C_02012010

    Document Title:Voyager III Controls Options Schematic - Constant Volume without Statitrac, Models TC*330A - TC*600A, TE*330A - TE*600A, YC*330A - YC*600A
    Publication Type:Wiring Diagram or Manual
    Publication Date:2010-02-01
  • Media type icon

    41-5016-12_03012011

    Document Title:INSTALLATION, OPERATION, AND MAINTENANCE GUIDE - Upflow / Horizontal* and Downflow / Horizontal*, Single Stage Direct Vent Gas-Fired Condensing Furnaces Models: CUX1, CDX1
    Publication Type:Installation
    Publication Date:2011-03-01
    furnace shall be installed so electrical components areprotected from water. 8. If the furnace is installed in a residential garage, it must beinstalled so that the burners, and the ignition source are locatednot less than 18 inches above the floor and the furnace must belocated or protected to avoid
  • Media type icon

    EDU-SLB075-EN_07082025

    Document Title:Commercial HVAC NC3 Certifications- Building Automation Systems
    Publication Type:Sales Brochure
    Publication Date:2025-07-08
  • Media type icon

    22-1802-03_04012009

    Document Title:Trane Product Data Upflow/Horizontal 80 percent 2-Stage, Variable Speed Gas-Fired Furnace with Whole House Air Cleaner XV80i Models
    Publication Type:Product Data
    Publication Date:2009-04-01
    GAS FURNACES ElectricalData 15 PUB. NO. 22-1802-03 FieldWiring 1. Be sure power agrees with equipment nameplates. 2. Low voltage (24 volt wiring) to be No. 18 A.W.G. min. 3. Grounding of equipment must comply with local codes. 4. Set thermostat heat anticipator per unit wiring diagram. 5. These
  • Media type icon

    RF-SLB007-EN_06062024

  • Media type icon

    1213-1671C_11062015

    Document Title:Precedent Diagram Connection Print Cooling Only 3-5 Tons 1213-1671 575V Electromechanical Control TSC033*WE, TSC036*WE, THC033*WE, THC036*WE, TSC043*WE, TSC048*WE, THC043*WE, THC048*WE, TSC063*WE, TSC060*WE, THC063*WE, THC060*WE
    Publication Type:Wiring Diagram or Manual
    Publication Date:2015-11-06