Search Results: 18-CH83D1-1B-EN

Showing 1,241 - 1,250 of 7,116 results

Display results per page.
  • Media type icon

    CLCH-SVX08F-EN_09302025

    Document Title:Gas Heat Performance Climate Changer™ CSAA Air Handlers
    Publication Type:Installation Operation and Maintenance
    Publication Date:2025-09-30
    , p. 17). Figure 10. Entering airside (drum or primary) of gasheat section Figure 11. Leaving air side (tube or secondary) of gasheat section Installation 18 CLCH-SVX08F-EN PipingWARNING Explosion Hazard and Deadly Gases!Failure to follow all proper safe refrigerant handlingpractices could result in
  • Media type icon

    1213-3271B_12162019

    DEVICE DESIGNATION DEVICE LOCATION DESCRIPTIONEDC 1B SWITCH-DEFROST CONTROLIDM 1A MOTOR-INDOOR FANRB 2B RELAY BOARD TNS3 1A TRANSFORMER 24VACOM 3A OPTIONS MODULEF 2A FAN CONTACTOR CONDUCTOR NUMBER BASE COLOR TRACER COLOR1 BLACK2 RED3 BLUE4 ORANGE5 YELLOW6 BROWN7 RED BLACK8 BLUE BLACK9 ORANGE BLACK
  • Media type icon

    2309-4870H_02242022

    LOCAL APPLICABLE CODES. ALL CUSTOMER CONTROL CIRCUIT WIRING MUST BE COPPER CONDUCTORS ONLY AND HAVE A MINIMUM INSULATION RATING OF 300 VOLTS.EXCEPT AS NOTED ALL CUSTOMER WIRING CONNECTIONS ARE MADE TO CIRCUIT BOARD MOUNTED BOX LUGS WITH A WIRE RANGE OF 14TO 18 AWG. DO NOT RUN LOW VOLTAGE CONTROL
  • Media type icon

    PART-SVN152B-EN_05152020

    Document Title:Location of Parts - Motor Change Out Kit, KIT16331, Model Numbers: CVHE / Installation Instructions
    Publication Type:Installation
    Publication Date:2020-05-15
    , adjusted or altered equipment by an unqualified person could result indeath or serious injury. When working on the equipment, observe all precautions inthe literature and on the tags, stickers, and labels that are attached to theequipment. © 2020 Trane Model Numbers:CVHE May 2020 PART-SVN152B-EN
  • Media type icon

    RT-PRC071B-EN_03182020

    Document Title:IntelliPak™ I Pre-Engineered Special: 60-75 ton with 40HP 208/230V/60Hz Motor
    Publication Type:Product Catalog or Quick Reference Guide
    Publication Date:2020-03-18
    residential applications. For more information, please visit trane.com or tranetechnologies.com. RT-PRC071B-EN 18 Mar 2020 Supersedes RT-PRC071A-EN (Apr 2015) Limitations Performance Selection & Ordering Process Pricing Lead Time
  • Media type icon

    PKG-PRC025B-EN_05162025

    Air Rotation Unit (ARU) May 2025 PKG-PRC025B-EN Product CatalogAir Rotation Unit (ARU) Indoor Unit ©2025 Trane PKG-PRC025B-EN IntroductionTrane Air Rotation Units (ARU) Trane air rotation units are the ideal solution for heating and cooling large open spaces. Air rotation unitsare the perfect
  • Media type icon

    DL-SVN039A-XX_11012018

    Document Title:Air Conditioners / Installation
    Publication Type:Installation
    Publication Date:2018-11-01
    -3 /813 Fente de 2-3/8 x 13/16 1-18/32 Entré e d’ air Entré e d’ air 40 840 175 500 390 330 349~ 371 Fente de 2-10 x 21 Unité: pouce Unité: mm NTXSKS18A112A✱ NTXSKS24A112A✱NTXSKS30A112A✱NTXSKS36A112A✱ VG79A981H01_FR.indd 9 2018-09-05 10:07:10 10 A B 4. Mise en place des tuyaux de réfrigérant 4.1
  • Media type icon

    23116085_A_08232023

    WIRE RANGE OF 14TO 18 AWG. DO NOT RUN LOW VOLTAGE CONTROL WIRING (30 VOLTS OR LESS) IN CONDUIT WITH 110 VOLT OR HIGHER WIRING. DO NOT EXCEEDTHE FOLLOWING MAXIMUM RUN LENGTHS FOR A GIVEN SIZE: 14 AWG, 5000 FT; 16 AWG, 2000 FT; 18 AWG, 1000 FT. THE CONTACTS FOR THESE FEATURES ARE JUMPERED AT THE FACTORY
  • Media type icon

    ODR-SVX008B-EN_09192025

    Electrical 18 ODR-SVX008B-EN Figure 25. AC or heat pump, typical (with furnace) Furnace Evaporator Coil MCB Furnace OutdoorUnit R G B W1 W2 R B O Y/Y1 R G B Yi O Y1 Y2 BK Yo3) 3) BKi Y23) X2 R G B Y1 BK R G B/C O Y1 W1 24 VAC HOT FAN 24 VAC Common COOL HEATING W2 BK Thermostat 3) 1) Units with
  • Media type icon

    TF-SVX005A-EN_06152025

    flammable refrigerant. A2LWork Procedures 18 TF-SVX005A-EN Installation MechanicalInspect and Report DamageUpon receipt, inventory the shipment against the Trane billof lading to confirm all modules and components havebeen delivered.Inspect each package in the shipment for visible damage.Verify the