Search Results: ED*

Showing 1,201 - 1,210 of 1,420 results

Display results per page.
  • Media type icon

    TF-SLB009-EN_12162025

    Document Title:PEP Ecopassport®
    Publication Type:Sales Brochure
    Publication Date:2025-12-16
    -materials- waste-and-recycling/rubber-and-leather-material-specific-data Registration number: TRNE-10010-V01.03-EN Drafting rules: “PEP-PCR-ed4-EN-2021 09 06” Supplemented by “PSR-0013-ed3.0-EN-2023 06 06” Verifier accreditation number: VH44 Information and reference documents: www.pep- ecopassport.org
  • Media type icon

    CTV-SLB070-EN_02172023

    continents and in an array of markets including education, healthcare, government, industrial/manufacturing, data centers, lodging, retail and commercial real estate. With more than 900 U.S. patents to date, Trane creates comfortable and energy-efficient environments around the world. Trane systems
  • Media type icon

    ENGY-SLB077-EN_03112026

    Document Title:Transforming Facilities to Build a Better Tomorrow
    Publication Type:Sales Brochure
    Publication Date:2026-03-11
    resilience with renewable integration, onsite generation, microgrid capabilities, and energy storage solutions. Community, Workforce, & Educational Collaborations Create meaningful impact through community engagement, workforce development, and STEM education initiatives aligned with your mission. What This
  • Media type icon

    BAS-SVN241A-EN_03212026

    Document Title:Trane® Cell Modem
    Publication Type:Installation
    Publication Date:2026-03-21
    to prevent water ingress; avoid locations near heat sources or where water might collect. 3. Prepare cable entry and sealing.a. Create a cable entry point by removing a knockout or drilling a new hole in the cabinet; a ~1-inch opening is sufficient.b. Deburr all edges thoroughly to prevent cable
  • Media type icon

    AC-SLB012-EN_12202024

    Document Title:PEP Ecopassport®
    Publication Type:Sales Brochure
    Publication Date:2024-12-20
    -EN Drafting rules: “PEP-PCR-ed4-EN-2021 09 06” Supplemented by “PSR-0013-ed3.0-EN-2023 06 06” Verifier accreditation number: VH44 Information and reference documents: www.pep- ecopassport.org Date of issue: 12-2024 Validity period: 5 years Independent verification of the declaration and data in
  • Media type icon

    CLCH-SLB043-EN_02282026

    Document Title:PEP Ecopassport® Product Environmental Profile – Performance Climate Changer® Semi-Custom Air Handling Units (CSAA and PSCA) FEBRUARY 2026 RN TRNE-10004-V0.1.01-EN
    Publication Type:Sales Brochure
    Publication Date:2026-02-28
    -specific-data Registration number: TRNE-10004-V01.01-EN Drafting rules: “PEP-PCR-ed4-EN-2021 09 06” Supplemented by “PSR-0008-ed3.0-EN-2023 10 19” Verifier accreditation number: VH44 Information and reference documents: www.pep- ecopassport.org Date of issue: 2-2026 Validity period: 5 years
  • Media type icon

    CDHF-SVX004E-EN_04112026

    exchangertubing that could lead to in-service tube failures. Eddycurrent tests conducted before a chiller is put into serviceare considered “baseline” eddy current tests, and areintended to establish a reference point to aid in theinterpretation of future eddy current test reports. Many ofthe anomalies that
  • Media type icon

    CDHH-SVX003F-EN_04112026

    every three years. Eddy current tests are intendedto identify defects on or within the walls of heat exchangertubing that could lead to in-service tube failures. Eddycurrent tests conducted before a chiller is put into serviceare considered baseline eddy current tests, and areintended to establish a
  • Media type icon

    CVHE-SVX005E-EN_04112026

    tests are intendedto identify defects on or within the walls of heat exchangertubing that could lead to in-service tube failures. Eddycurrent tests conducted before a chiller is put into serviceare considered “baseline” eddy current tests, and areintended to establish a reference point to aid in
  • Media type icon

    CVHH-SVX003F-EN_04112026

    intendedto identify defects on or within the walls of heat exchangertubing that could lead to in-service tube failures. Eddycurrent tests conducted before a chiller is put into serviceare considered baseline eddy current tests, and areintended to establish a reference point to aid in theinterpretation