Search Results: ED*

Showing 1,021 - 1,030 of 1,420 results

Display results per page.
  • Media type icon

    RT-SVX070C-EN_05302023

    Document Title:Packaged Rooftop Air Conditioners, Precedent™ Cooling and Electric Heat, Standard Efficiency 6 to 25 Tons - 60 Hz
    Publication Type:Installation Operation and Maintenance
    Publication Date:2023-05-30
    (if applicable). Referto the latest edition of the curb installers guide thatships with each curb kit. • Fabricate and install ductwork; secure ductwork tocurb. • Install pitch pocket for power supply through buildingroof. (If applicable) • Rigging the unit.• Set the unit onto the curb; check for
  • Media type icon

    RT-SVX071D-EN_08192023

    Document Title:Packaged Rooftop Air Conditioners, Precedent™ Cooling and Gas/Electric, Standard Efficiency 6 to 25 Tons - 60 Hz
    Publication Type:Installation Operation and Maintenance
    Publication Date:2023-08-19
    return opening (insulation side down).3. Using self-drilling screws, (or screws removed from duct cover), screw through dimples to attach DUCTCOVER to base. Figure 43. Supply duct cover Supply Duct Cover Screw into fourdimples on top edge 4. On original RETURN DUCT COVER, apply ¼-inch (6mm.) continuous
  • Media type icon

    RT-SVX074A-EN_12022022

    Document Title:Packaged Rooftop Air Conditioners Precedent™ Cooling and Electric Heat High Efficiency 6 to 25 Tons – 60 Hz
    Publication Type:Installation Operation and Maintenance
    Publication Date:2022-12-02
    , options and voltage from unitnameplate. • Verify that the installation location of the unit willprovide the required clearance for proper operation. • Assemble and install the roof curb (if applicable). Referto the latest edition of the curb installers guide thatships with each curb kit. • Fabricate
  • Media type icon

    RT-SVX075C-EN_08192023

    Document Title:Packaged Rooftop Air Conditioners Precedent™ Cooling and Gas/ Electric High Efficiency 6 to 25 Tons – 60 Hz
    Publication Type:Installation Operation and Maintenance
    Publication Date:2023-08-19
    COVER over downflow return opening (insulation side down).3. Using self-drilling screws, (or screws removed from duct cover), screw through dimples to attach DUCTCOVER to base. Figure 43. Supply duct cover Supply Duct Cover Screw into fourdimples on top edge 4. On original RETURN DUCT COVER, apply
  • Media type icon

    ACC-SVN53J-EN_04202020

    Document Title:Discharge Air Sensing Kit
    Publication Type:Installation
    Publication Date:2020-04-20
    supply air duct cover on the rear side of the unit.5. Bend clip with flat head screwdriver on mounting bracket approximately 20° down. Refer to Figure 3. Figure 3. Note: For units without slot clearance hole, bend tab at flat edge down 90°. Refer to Figure 4. Figure 4. 6. Install the mounting
  • Media type icon

    ACC-SVN50M-EN_12102020

    Document Title:Evaporator Defrost Control
    Publication Type:Installation
    Publication Date:2020-12-10
    for this accessory to operate. The evaporator defrost control (EDC or Frostat™) is installed in the evaporator (Indoor) coil face area. It's purpose is to cycle the compressor when the evaporator frosts under low outdoor ambient cooling conditions or low airflow applications. Inspection 1. Unpack
  • Media type icon

    ACC-SVN177K-EN_01192024

    Document Title:Precedent™ Packaged Rooftop Units Low Leak Economizer ReliaTel™- Vertical Installation Only
    Publication Type:Installation
    Publication Date:2024-01-19
    harness. 7. Attach powered exhaust with self-drilling screws. See Figure 6. 8. Verify wire harness is clear of gears, doors, and any sharp edges of metal. 9. Hook up electrical as described in Power Exhaust Kit - Standard and Low Leak Economizers 6 to 10 Tons Installation Instructions (ACC-SVN57*-EN
  • Media type icon

    TEMP-PRC011A-EN_04152025

    Document Title:Trane Rental Services - I-Line Panels
    Publication Type:Product Catalog or Quick Reference Guide
    Publication Date:2025-04-15
    EMOV ABLE GLA NDS a. PADL OCKA BLE DOOR 5.HA RDW IRE ACCE SS6. CAGE WIT H FO RKLIF T PO CKET S7. 10" F OAM FILL ED T IRES FOR POR TABI LITY 8. TEMP-PRC011A-EN5 Vertical I-Line Panel 1200A RSIP1200S0 and RSIP1200J0 General Information • I-line interior rated for 600 V • UL50 listed • NEMA 3R • 65 KAIC
  • Media type icon

    REFR-SLB007-EN_04112025

    Document Title:Getting Ready for A2L Refrigerants - Here’s what HVAC contractors and technicians need to know.
    Publication Type:Sales Brochure
    Publication Date:2025-04-11
    . A2L refrigerants require A2L compatible tools. Trane’s new A2L Tool Kit bundles them together. It includes: • Fieldpiece® Vacuum Pump (VPX7) • Fieldpiece® Leak Detector (DR-82) • Fieldpiece® Recovery Machine (MR-45) • Victor Edge Series 2.0 Hybrid Regulator (REG00619) Trane Resource: Order the A2L
  • Media type icon

    REFR-SLB017-EN_04152025

    Document Title:QUICK REFERENCE - ANSI/ASHRAE® Standard 15-2022
    Publication Type:Sales Brochure
    Publication Date:2025-04-15
    QUICK REFERENCEANSI/ASHRAE® Standard 15-2022 Section 7.2.3.2.2, Equation 7-2a1 Natural Ventilation Opening for Group A2L Refrigerants • Avent: minimum area of permanent opening• mroom: allowable refrigerant charge of an individual room (EDVC)• A: actual area of the individual room• g: acceleration