Installation Operation Maintenance - Trane Quantum Air Handler / Model: CLCP Euro / CLCP XP
Publication Type:
Installation Operation and Maintenance
Publication Date:
2010-01-01
CLCP-XP - Break Point 15 TRANE R Assembly & Installation CLCP-XP - Break Point 16 TRANE R 17 Assembly & Installation CLCP TRANE R Assembly & Installation CLCP 18 TRANE R 19 Assembly & Installation Piping - Condensate DrainPan Connections On cooling section(s) the drain pan should always be connected
2022 Trane. All Rights Reserved.All trademarks referenced in this document are the trademarks of their respective owners. REFR-SLB004-EN 05/02/2022 Additional Resources• Update to the Refrigerant Management Requirements Final Rule: www.epa.gov/section608/revised-section-608-refrigerant-management